Xinpuguang 600 Watt On-grid Micro Inverter System Kits Connect Solar Panel

Prezzo
$144.90
Tasse e spedizione calcolate al momento del pagamento
American Express
Apple Pay
Google Pay
Mastercard
PayPal
Shop Pay
Union Pay
Visa

Frequently Bought Together

Product Information

Micro Inverter WVC600
System Function
• Power line carrier-current communication
By using electric power as a carrier of AC alternating current, can modulate high-frequency and carrier frequency (60KHz) in AC wire transmission and can achieve the communication/ newsletter between inverters or between inverter and computer. And it can transfer the power data. Also monitor all functions of inverter.
1.Carrier frequency: 60KHZ(Frequency customizable);
2. Interface way: TTL level serial interface;
3.Carrier rate: 300BPS;
4. Serial rate: 9600PS(Can customize according to customers request);
5. Modulation mode : FSK+DSSS;
6.Newsletter distance:400m;

Packing listing

1x600W Mirco inverter

1x AC interface cable

4xMounting screws

Specification

Mirco Inverter
Solar Panel Open Circuit Voltage Range: 36-50VOC
Peak Power Tracking Voltage: 22-45V
Min/Max Start Voltage: 22-50V
Maximum DC Short Circuit Current: 40A
Maximum input operating current: 27.2A
Output Parameters: @120VAC/@230VAC
Peak output power: 600Watt
Rated output power:550Watt
Rated output current:4.58A/2.39A
Rated voltage range: 90-160VAC/190-260VAC
Rated frequency range:47-52.5Hz /57-62.5Hz
Power factor: >99%
Number of connected units per string circuit: 5 sets(Single Phase)/10 set(Single Phase)
Output efficiency: @120VAC/@230VAC
Static MPPT efficiency: 99.50%
Maximum Output Efficiency: 90.50%
Night-time power loss: <1W
THD: <5%
Operating temperature range: -40℃to +60℃
Dimension (L×W×H): 283mm×200mm×41.6mm
Net weight: 1.63kg
Waterproof grade: IP65
Heat dissipation mode: self-cooling
Communication mode: 433/462MH zwireless communication
Power transmission mode: Reverse transfer, load priority
Electromagnetic compatibility: EN50081.part1   EN50082.part1
Grid disturbance: "EN61000-3-2 Safety
EN62109"
Grid detection: DIN VDE 1026 UL1741
Certificate: CEC,CE

use note

1. After the solar power generation system is installed correctly, do the following test preparation work before the AC power-up: (1)Please check whether all the plugs connected well, whether there is a loose connection; (2) Measure all L-N, L-G, N-G of each branch, in order to no short circuit, if there is a short circuit, please correct; (3) Complete the above preparation work and prepare the test run;
2. The time point of test run, please select noon and the sunshine is the most strong time of the local time;
3. To connect AC power to see if each inverter is on the green light or fast flashing;
4. Please measure each branch's AC voltage of the AC endpoint V1 (as shown in the figure) at the system full load output (Max. output);
5. Please measure AC voltage of the grid-connecting point V2 (as shown in the figure) at the system full load output (Max. output);
6. The voltage difference between V1 and V2 must be less than 5V, if more than 5V then the load capacity of the main/branch cable is not enough;
7. Micro Inverter of 230V version: please ensure that the grid-connecting point voltage V2 is in this range: 190V~252V;
8. Micro Inverter of 120V version: please ensure that the grid-connecting point voltage V2 is in this range: 90V~152V;
9. Strictly unplug the inverter connector with electricity, power grid MUST be cut off while unplugging!

Warehouse
warehouse solar panel

In order to provide better service, Customers can receive the products quickly.we have set up warehouses in many countries, United States,Australia,Canada, Germany, UK, Spain, France,Belgium, Saudi Arabia. Germany,  Full coverage of EU countries, can be delivered.Our warehouse range is also expanding, please look forward to.

Free Shipping

Shipping is free for non-remote addresses

Fast shipping

Warehouse address local shipping, shipping speed.

Recommended for You